Loading…
Loading…
20,291 results • Best match
Construction of Bridge in Jorhat District i) Br No 1/3 Tipomia over river Tipomia on Mohimabari Nowpeta to Jonaki Mondal Connecting Road
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. I) In Ordinary Soil B. Mechanical means. ii) Depth up to 3.00 m (with dewatering)
Construction of concrete drain from culvert bridge to Tapan Dass house at Chhatri-X, JL No-184, Polt No- 2526-2529, Tied Fund.
Construction of concrete drain from culvert bridge to Tapan Das's house at Chhatri-X, JL No-184, Polt No- 2526-2529, Tied Fund.
Construction of Road from Masadda bridge road to Madhusudan Ghosh house under Burwan Block (Length of the Road 0.700 Km). in Murshidabad District.
CE/EAP/ARRBP/OCB/Bridge1/Majuli/03A Construction of Bridge in Majuli district i) Br. no. 2/1 on Kuhiarbari to Morsutigaon road
Excavation for Structures, Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material, I. Ordinary Soil, B Mechanical Means with dewatering i) Depth upto 3 m
Construction and five year routine maintenance of Submersible bridge at Ch 5800 on NH 561 to Rohatwadi Ghatewadi Adsulwasti Bensur Road Tq. Patoda
Construction of Bridge in Lakhimpur District i) Br. No. 1/1 over Kakoi river on Kadam Kangkan Tiniali to Gajihola missing gaon road
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. I) In Ordinary Soil B. Mechanical means. ii) Depth up to 3.00 m (with dewatering)