Loading…
Loading…
20,717 results • Best match
CONSTRUCTION OF MAJOR BRIDGE AT CH 32.253 WITH SPILL OVER BRIDGE )ON HIWARKHED TELHARA ADSUL ROAD S.H. 279 IN TELHARA TAHASIL DISTRICT AKOLA IInd Call
Package No. CE/EAP/ARRBP/OCB/Bridge-1/Charaideo/03A Construction of Bridge in Charaideo district i) Br. No. 2/2 on Kalakata Gohain Gaon
Package No. CE/EAP/ARRBP/OCB/Bridge-1/Majuli/07A Construction of Bridge in Majuli district i) Br. No. 2/1 on Bhakat Chapori Road
Construction of 4-Lane 35m single span Steel Plate Girder Bridge over Main Ranbir Canal (MRC) on Right Bank of Right Bank of Tawi river Front Phase-I
... rate is inclusive of contractor's own machinery and equipment, labour, taxes, temporary works, consumables, all lead & lifting, shoring, strutting, timbering and buttressing with ...
Construction of RCC Foot bridge over Kufu Twisa at Bhaskra para of Haludia VC under Mungiakami RD Block , Teliamura RD Division, Khowai District (as per PWD SoR 2023).
Construction of 5x6 M minar bridge over Sasur Khaderi river at Chainage 6.500 (between Arka-Paksarai) of Myohar Khas-Arka Fatehpur-Kaju road in district Kaushambi. (Box Culvert)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres