Loading…
Loading…
20,511 results • Best match
GENERAL Pre monsoon Removal of Waste 2026 GENERAL PRE MONSOON 2026 2027 Urgent removal of floating material and debris to clear the blockage near Kanjiramthuruthu bridge in Cheruthana Panchayath of Harippad LAC 2026 General Civil Work
Construction of RCC foot bridge at Gurucharan para PWD road to Nugurai Kupra para over Murkumacherra near Ajit Debbarma house at Holongmwtai VC under Tulashikhar RD Block as per PWD SoR-2020
Thanjavur District - Package No.01 - Construction of Bridge across Mudikondan River along Mandagamedu to Keelapalayar Road in Keelapalayar Panchayat at Kumbakonam Block under Saving Fund State Special Assistance - Phase I - 2025-26.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}.
Thanjavur District - Package No.02 - Construction of Bridge across Thirumalairajan river along Mulaiyur to Melapalaiyar Road in Ariyapadaiveedu Panchayat at Kumbakonam Block under Saving Fund State Special Assistance - Phase I - 2025-26.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}.
Construction of Retaining Wall from Balaji Mandir Bridge near Kanh River Side to Mahadev Ghat toward Bhal Bhawan in Ward No. 63 Zone No. 18 under Mukhyamantri Nagriya Shetra Adhosanrachna. Second Call
Construction of Retaining Wall from Balaji Mandir Bridge near Kanh River Side to Mahadev Ghat toward Bhal Bhawan in Ward No. 63 Zone No. 18 under Mukhyamantri Nagriya Shetra Adhosanrachna.
Construction of fully automated multi purpose feed plant with Godown and Weigh Bridge (4-6 TPH) , Boiler set etc. at Govt. Duck cum poultry farm, Kaliabor in Nagaon District under RIDF XXXI
10.2 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.