Loading…
Loading…
20,831 results • Best match
Strengthening of Road from Gulmohar Canal to Indus Centre Point (Near Akriti Eco City) Road - Length 2.40 Km. .) PAC 951.72 Lacs Second call on Road and Bridge S.O.R. wef 11-04-25 Work Period 300 days i/c rainy season
Strengthening of Road from Gulmohar Canal to Indus Centre Point (Near Akriti Eco City) Road - Length 2.40 Km. .) PAC 951.72 Lacs Second call on Road and Bridge S.O.R. wef 11-04-25 Work Period 300 days i/c rainy season
PBMC of Sumer Hathiyakhedi upto Bhadarwada Gaon length 7.64 km. and various roads total length 22.24 km. PAC RS. 777.79 LACS First call on on Road and Bridge S.O.R. wef 11-04-25 Work Period 1825 days i/c rainy season
... length 0.80 km. total length 22.24 km. PAC RS. 777.79 LACS First call on on Road and Bridge S.O.R. wef 11-04-25 Work Period 1825 days i/c rainy season
Auction of Dredged spoil collected from the work FC-River course correction work by dredging Korappuzha River from Railway Bridge at Ch 418.32 KM to Korappuzha River mouth in KoyilandyTaluk
A/R and M/O various road under PWD Division West Road-1/Sub division WR-12 dg. 2025-27. (SH Repair and Maintenance of 2 Nos Foot Over Bridge (District Center Janakpuri and Outer Ring Road Viksapuri) and 3 Nos. of Subway (Ganesh Nagar, Tilak Nagar....
... design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per... agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding ...
Construction / Upgradation of Road/ CD works including maintenance for Five Year after construction. RBR-Bridges
Construction & Maintenance of Bridges under Rehabilition of Bridges of Package No.MP49RBR01_Alirajpur (Offer Based on SSR issued by PWD Effective from 11-04-2025.) as per detailed BOQ attached in Annex-II A
Construction of Cross drain with cover Slab at Malatipur Bazar from Malatipur Rail Bridge to Salams shop within Chaita GP under Basirhat-II Panchayat Samity under 15th FC Tied Fund for the Year 2025-2026 ID-127000382
Construction of Cross drain with cover Slab at Malatipur Bazar from Malatipur Rail Bridge to Salams shop within Chaita GP under Basirhat-II Panchayat Samity under 15th FC (Tied) Fund for the Year 2025-2026(ID-127000382)