Loading…
Loading…
8,150 results • Best match
Comprehensive Annual Repair and Maintenance ARMO of Civil and Electrical works at ESIC Hospital Naroda Gujarat
Comprehensive Annual Repair and Maintenance (AR & MO ) of Civil and Electrical works at ESIC Hospital Naroda, Gujarat. (Including all taxes)
Urgent Repair and Maintenance of Doctors quarters(Qtrs No.XV/289) at ICDP Campus Aluva
50.12.4.1:Providing and fixing false ceiling with 7.5 mm thick PVC plain panel board ceiling of approved quality in aluminium frame work with necessary screws etc complete (aluminium frame work shall be paid separately)
GENERAL Budget 2025 26 Construction of new school building for Govt U P School at Bangla Kadavu Ranny Pathanamthitta District Budget 2025 2026General Civil Work
15.10.1:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In lime mortar
GENERAL-General Education Department Annual plan 2025-26 Construction of additional floor over the existing building of Government High School Kadambar , Kasaragod-General Civil Work
OD289177/2025-2026:Providing and laying in position weigh batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. All work above plinth level upto floor V level
Building Work/ Building Maintenance Work/ Civil development works with PH items.
31 Guidelines for Air Pollution mitigation (i) The charges for the Air Pollution mitigation measures shall be borne by the contractor without any extra cost to the department. (ii) Contractor shall follow the directions for Dust and Pollution Control measures in construction as notified by MoEF&CC / MoHUA / CPWD / BMC or any other statutory authority. (iii) All precautionary measures for control of Air Pollution due to Building Construction Activity shall be taken as per Local Statutory/ Municipal Authority Air Pollution Mitigation Plan. (iv) Mandatory Form for Building Construction activity to control Air Pollution along with supporting documents and site photographs shall be submitted to concerened authority or uploaded on online portal. (v) Projects attracting Environmental Clearance shall carry out Third Party Ambient Air Monitoring every fortnightly from NABL / MoEF&CC laboratory.
Civil and Electrical works for Construction of Model AYUSH OPD Building in the district of Purba Mednipur, West Bengal during the year of 2025-26 at SHD at Barsundra PHC (2nd Call)
Civil & Plumbing works for Construction of Model AYUSH OPD Building in the district of Purba Mednipur , West Bengal during the year of 2025-26 at SHD at Barsundra PHC. (refer detailed BOQ 1-A)