Loading…
Loading…
8,167 results • Best match
Construction/Renovation of toilets for Consumers and other civil work at various newly established Help desks in Muzaffaranagar City, Dist. Muzaffarnagar
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works DSR No. 10.25.2
SPECIAL REPAIR WORK AND OTHER MISCELLANEOUS CIVIL WORKS AT 33/11 KV SUB-CENTRE SAHARA, 33/11 KV SUB-CENTRE JARUA KATRA AND 33/11 KV SUB-CENTRE MIDHAKUR UNDER DISTRICT AGRA.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (DSR 10.25) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2)
SPECIAL REPAIR WORK AND OTHER MISCELLANEOUS CIVIL WORKS AT 33/11 KV S/S SADHAN, 33/11 KV S/S ACHHNERA AND 33/11 KV S/S TAJPUR NAGARIYA UNDER DISTRICT AGRA.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (DSR 10.25) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2)
Construction of Testing Room, Store Room and Remaining Civil work at Transformer repairing Workshop Mawana Adda, Meerut
Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. NSI Ref CSI No. 9.01 (SOR 23-24)
Civil Development work /Road works and associated works with an item of concrete Paver block
31 Guidelines for Air Pollution mitigation (i) The charges for the Air Pollution mitigation measures shall be borne by the contractor without any extra cost to the department. (ii) Contractor shall follow the directions for Dust and Pollution Control measures in construction as notified by MoEF&CC / MoHUA / CPWD / BMC or any other statutory authority. (iii) All precautionary measures for control of Air Pollution due to Building Construction Activity shall be taken as per Local Statutory/ Municipal Authority Air Pollution Mitigation Plan. (iv) Mandatory Form for Building Construction activity to control Air Pollution along with supporting documents and site photographs shall be submitted to concerened authority or uploaded on online portal. (v) Projects attracting Environmental Clearance shall carry out Third Party Ambient Air Monitoring every fortnightly from NABL / MoEF&CC laboratory.