Loading…
Loading…
96,884 results • Best match
MLA-SDF-Construction of Periyar Enclave Branch 2 Road in Ward 05 Vadakkekara GP North Paravur BP-2025-26-General Civil Work
Annual Plan CHERUPUZHA GP 2025 26 CONSTRUCTION OF PROTECTION WALLTO CHERUPUZHA CHALIYODE BHOODHANAM ROAD Pro No 420 25 26 General Civil Work
SIDE PROTECTION WORK
Annual Plan Construction of culvert in Tharayilkavala Vavakkad Road Ward 04 Vadakkekkara GP North Paravur BP NPR 166 2025 General Civil Work
OD338910/2025-2026:RING BUND Type II putting up ring bund with earth fille gunny bags of top width 0.75m bottom width 1.5 height 1.5 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the complete of the work and clearing the site by dismantling the bund after complete of the work .etc .complete MODIFIED 60.1.2
124127 LAC-ADS-Irinjalakuda LA, 2025-26, Velukkara GP, ward-9, Construction of Decent Road, Vellangallur BP-In Vellangallur BPGeneral Civil Work
... so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
Annual Plan-Nanniyode GP 2026-27, Project 127/27-Construction of Side wall in Thottumukku Nanjikkunnu Road ward 3-General Civil Work
Annual Plan-Kulathoor GP 2024-25 (P.No.370)-Construction of Kakkaravila-Attakulam Side Drain- Ward-4 of Kulathoor GP-General Civil Work
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal ...