Loading…
Loading…
98,149 results • Best match
Civil Renovation works in the Auditorium at Chemical Engineering Department in Zone E at IIT Roorkee
eProcurement System Government of India Created By: Narendra Singh Rana Created Date/Time: 06-Jan-2026 11:39 AM Tender Title: Civil Renovation works in the Auditorium at Chemical Engineering Department in Zone E at IIT Roorkee Tender ID: 2025_IITR_887121_1
LAC-ADS-2025-26 Kayamkulam - LAC work -Improvement by providing Interlocking Tile works to Mecherithara - Kadambanadu Road in Chettikulangara Grama Panchayath ward 18- work-General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Facility Management Services - LumpSum Based - Construction of Boundary Wall at 33 11 kV Substation Kumrahwa District Lucknow; Civil Works; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Construction of Boundary Wall at 33 11 kV Substation Kumrahwa District Lucknow; Civil Works; Consumables to be provided by service provider (inclusive in contract cost)
UPVC windows
Providing UPVC Windows, Painting to ENT Department Ramp, Pipe line repair to Charaka Block, WPC to New OT Sump, Minor Civil repairs to Blood Bank Water supply line, Parking Tiles, Water Proofing, CC Works, Plastering to P&SM Department to Ballari Medical College & Research Centre, Ballari
GENERAL-Construction of VCB-Construction of Side protection wall and Leading channel near Keezhichira VCB in Thirumarady panchayath under Piravom constituency - PHASE II-General Civil Work
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
Construction