Loading…
Loading…
98,654 results • Best match
Annual Plan-Annual plan 2024-25 PIDUCHIKETTIPUZA ROAD CONSTRUCTION DIVISION-2 Prj No61/25-PIDUCHIKETTIPUZA ROAD CONSTRUCTION DIVISION-2 Prj No61/25- General Civil Work
LAC-ADS-Shornur Constituency -2025-26 - Construction of Keezhoor Road Bridge -Kunchupady Tharuvakonam Road, Ananganadi Grama Panchayath, Palakkad District -General Civil Work
Road work
LAC-ADS-LAC ADS 2025-26 Azhikode LAC Sri.KV Sumesh MLA-Kottarathumchal Neerozhukkumchal Road Sidewall Construction at Chirakkal GP-General Civil Work
OD317842/2025-2026:Fixing plaque for MP LADS/MLA ADS works-Stone tile (polished) work for wall lining over 12mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and cement slurry @ 3.3 kg/sqm including pointing in white cement complete.Granite of any colour and shade.
Annual plan 2025 26 VORKADY GP PRO 62 subcenter compound wall at Pavoor ward 1 Pathur ward 7 Construction General Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
LAC-ADS-2025-26 23725 Sri Adv Job Michel MLA Changanassery Constituency Construction of Kargil Junction Road Kurichy GP General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
MP-LADS-MP LADS 2025-26-Sri. Jose K.Mani, Honble MP(RS) Construction of Mankadavu Vellomkunnelpady Road, Udayagiri Panchayat General Civil WorK
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.