Loading…
Loading…
98,797 results • Best match
Annual Plan-Kainakary Grama Panchayth Proj No 184 Baby friendly toilet- Construction of Baby friendly toilet for Anganwadi no2 ward3- General Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Annual Plan LSGD ANNUAL PLAN 2025 26 CHEKKIAD GP PR NO 102 Construction of Odorakkunnu Play ground IN WARD 8 General Civil Work
Road work
Retender NABARD-RIDF XXX-THIRUVAYIKKARI TURKEY Construction of pump house and Parakkuzhy at Thiruvayikkari Turkey Padasekaram, Thiruvarpu Krishibhavan, Kottayam District General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Retender NABARD-RIDF XXX - Thatarkadu Padasekharam Thiruvarpu Krishi Bhavan - Kottayam District-Construction of Pump house and Parakkuzhy at Thatarkadu padasekaram-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
GENERAL-Resurvey Office, Cherthala. Renovation work for Smart Office-General Civil Work (01 E Tender)
General Civil work
GENERAL Maintenance of Poovappuzha checkdam Strengthening of Side protection and other rectification works of Poovappuzha checkdam in Eraviperoor panchayt General Civil Work
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.