Loading…
Loading…
98,818 results • Best match
Annual Plan-1572 25-26-Road improvements and drainage works to Pachoose Hotel to DIS School in Division 43-General Civil Work
... bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal ...
Annual Plan-PRO NO.592/25-26 PLUMBING AND ELECTRIFICATION WORKS AT MUNICIPAL OFFICE AND ZONAL OFFICES GURUVAYUR MUNICIPALITY General Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
As per DNIT
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
Others
New Building
construction of drainage at Bus stand
APPENDIX -A CONSTRUCTION OF DRAINAGE
MP-LADS-Hon. Attingal MP Adv Adoor Prakash - Construction of Waiting shed in front of Gurudev ITI Ward 9 in Kilimanoor Grama Panchayath- General Civil Work
Work Name:MP-LADS-Hon. Attingal MP Adv Adoor Prakash - Construction of Waiting shed in front of Gurudev ITI Ward 9 in Kilimanoor Grama Panchayath- Construction of Waiting shed in front of Gurudev ITI Ward 9 in Kilimanoor Grama Panchayath-General Civil Work