Loading…
Loading…
98,840 results • Best match
Annual Plan Pariyathussery Construction of Drain with cover slab at Pariyathussery in ward-21 of Chellanam G.P. Palluruthy Block joint venture-General Civil Work
Construction of drain and footpath
MLA-SDF-Construction of Culvert and Tiling for Priyadarsini Road in Ward 14 of Vadakkekara GP North Paravur BP-2024-25-General Civil Work
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
MLA-SDF-Construction of Culvert and Tiling for Priyadarsini Road in Ward 14 of Vadakkekara GP North Paravur BP-2024-25-General Civil Work
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
GENERAL-CSIND - IWT -Improvement to Kuttisserikadavu canal-Construction of Box culvert near odetti padasekharam in ward no.21 of Vazhappally panchayath-General Civil Work
Construction of Culvert and Side Protection Work
Annual Plan-Project No 455- 2025-26 Construction of road side protection in front of Nandankizhaya GLP School in Muthalamada GP--General Civil Work
Annual Plan-ATPA GP P NO-S0214/25-26-Re Construction of Compound wall for Vegetable Market in Ward No XXII-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil