Loading…
Loading…
93,236 results • Best match
Construction of lane from H No.R-7 Rahman Building to H No.8247/A by pdg. CC Pavement in ward No.224, AC-64,Rohtash Nagar, Shah(N) Zone
Government eProcurement System Created By: BHUPENDRA KUMAR MEENA Created Date/Time: 09-Jun-2026 01:45 PM Tender Title: CIVIL WORK Tender ID: 2026_MCD_279128_1
Repair of Front Portion and Installation of ACP Panels including Allied Civil Works at Executive Hostel, Basundhara Area.
eProcurement System of Coal India Limited Created By: NITIN SAHARE Created Date/Time: 04-Jun-2026 05:05 PM Tender Title: Repair of Front Portion and Installation of ACP Panels including Allied Civil Works at Executive Hostel, Basundhara Area. Tender ID: 2026_MCL_356407_1
Estimate for Civil Works including Renovation and First Floor Construction of Badi Chaupal, Village Baliyawas, Ward-20, Division-4A, Zone-4, MCG. Recall
Civil Works including Renovation and First Floor Construction of Badi Chaupal, Village Baliyawas, Ward-20, Division-4A, Zone-4, MCG.
GENERAL-USR Work - Sheet roofing, Painting and other essential plumbing repair works to PWD Quarters at Ambalavayal.- Maintenance work-General Civil Work
Construction of ceiling
Work Name:GENERAL-Construction Ceiling work in III/8 Quarters-Construction of Ceiling-General Civil Work
Civil works Electrification works Fire Fighting works Lift works Solar works and STP Works etc
OD209783/2025-2026:Supply, erection, commissioning of additional length of Exhaust Pipes with long radius bend from silencer with necessary clamps, fixtures, civil works andthermal insulation with 50 mm thick glass wool and with 1.0 mm thick aluminium sheet cladding of following adequate size including suitable rain cap for top to avoid rain water entry. The distance between exhaust pipe at top and rain cap should be higher than diameter of pipe. The horizontal run of exhaust piping should slope downwards away from engine to the condensate trap. Silencer should be installed with drain plug at bottom. Fixing shall be done with proper clamps, expansion bolts, and all other acessories as instructed by the Engineer and the rate inclusive of all minor civil works required, bolts, clamps etc as required for istallation. Support to exhaust piping should be done in such a manner that load of exhaust piping is not exerted to turbocharger. Exhaust pipe height shall be 3m more than the top of any adjacent building withing 10m radius of the exhaust.