Loading…
Loading…
92,756 results • Best match
DEPOSIT Construction of new building for the Smart Village Office Mezhuveli Pathanamthitta work General Civil Work
RKVY SMAF Construction of Rainshelter at ISD Farm Eruthempathy-General Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Construction of Proposed Residence Quarters at District Jail Campus Haridwar (Civil Work)
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. sqm 338.25 Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.
DEPOSIT Construction of mini theatre for jawahar balabhavan kollamWork General Civil Work
Deposit work -Consruction of MInitheatre
GENERAL-Maintenance of Toilets in Govt. Ayurveda College Hospital, Thiruvananthapuram- Ward 5 Damaged toilets-Civil Works-General Civil Work
GENERALProviding partition works to Legal Services Committee Mediation rooms in Mini Civil Station Block 2 ranny General Civil Work
21.1.1.1:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately): For fixed portionAnodised aluminium (anodised transparent or dyed to required shade according to IS : 1868, Minimum anodic coating of grade AC 15)