Loading…
Loading…
94,149 results • Best match
GENERAL-FIRE AND RESCUE STATION PERINTHALMANNA-(Sump tank repair work)-Leack rectification works for Sump tank in fire and rescue Station at Perinthalmanna-General Civil Work
Repairs to Canteen flooring in ground floor of New City Civil Court Building. Mumbai.
Civil works
15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
Proposed Various Work of Construction, Repair and Renovation of Different Building at Campus of Dr. Ram Manohar Lohiya Awadh University Distt. Ayodhya (UP)
Repair and Renovation work Various Education Building at Dr. R.M.L. Awadh University Ayodhya
CIVIL WORKS FOR CONST. OF FENCING, TLF DRIVEWAY, ROADS AND DRAINS, UG WATER TANK AND RECHARGE PIT, PLANTATION, RWH, STRUCTURAL WORK, ACCESS PLATFORMS, AREA DEVELOPMENT AND OTHER MISC CIVIL WORKS FOR ADDITIONAL TANKAGE PROJECT AT AHMEDNAGAR DEPOT.
Civil Works for Construction of Fencing, TLF Driveway, Roads and Drains, U/G Water Tank and Recharge Pit, Plantation, Rainwater Harvesting, Structural Work, Access/Approach Platforms, Area Development and Other Miscellaneous Civil Works for Additional Tankage Project at Ahmednagar Depot Under Maharashtra State Office The rate quoted here shall be uniformly applicable to all the items in PR 9899502
Civil Work
Providing and Applying ACRYLIC emulsion polymer waterproofing chemical coating, on over roof on over roof slabs/terrace/balconies/parapet wall etc.with following method/specification: Paint the surface with regular paint brush so as to obtain approximately 0.3mm thickness coating. apply the 2nd coat next day at right angles to the 1st coat so that total thickness of the coating should be approximately 0.6mm coverage by using above formulation will be 40 ft2/ litre of chemical. painted surface does not require any external water curing since chemical will hold sufficient water for curing.After the primer coat Apply 2 coats of modified acrylic emulsion polymer water proofing compound having solar heat reduction properties coating @ 0.330 KG/SQM on the surface of the interval of 3-4 hours. Undulation on the surface is repair before the waterproofing work.