Loading…
Loading…
95,116 results • Best match
Construction of 04 class room boundary wall, repairing and other civil work including internal electrical work for Govt H.S. Nipaniya Jaat (UDISE Code 23320211803) at Rural Phanda Bhopal.
Construction of 04 class room boundary wall, repairing and other civil work including internal electrical work for Govt H.S. Nipaniya Jaat (UDISE Code 23320211803) at Rural Phanda Bhopal.
Repair and approach protection work of the Major bridge on Sarai River at Km. 10 of Hargaon Dateli Piperjhala Road (Civil Work)
Painting or vanishing on iron works in small areas or new wood work with one coat of ready mixed priming paints & two coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of work. paint to be used should confirm to the I.S.I. No 03-1950. (641+642)
Repairing of boundery wall (brick works Plaster work ) in Honble jusice bunglow at civil line at Hq no 3 jbp
Repairing of boundery wall (brick works Plaster work ) in Honble jusice bunglow at civil line at Hq no 3 jbp
GENERAL-Sainik School Kazhakoottam - Maintenance works in SMO residence. -Mace-General Civil Work
OD307085/2025-2026:Supplying and applying High build elastomeric water proofing coating based on pure ,hydrophobic polyurethane, cold applied of spray /brush applied, Poly Urethane membrane with an elongation of 350 % and tensile strength of 4.7 N/mm2 as per ASTM D 2370, crack bridging ability of 3 mm as per ASTM C 1305, no leakage upto 5 bars of water pressure as per DIN 1048, SRI Index of 106 with UV resistance. Water proofing method consisting of applying (a) Surface preparation including clearing work, removal of loose concrete and filling cracks with SBR based Polymer modified cement mortar, (b) making of angle fillets all around the periphery of the wall with SBR polymer modified cement mortar and grouting the gaps of pipes with general purpose grout (non shrink Cementitious water proof grout). (c) laying and applying epoxy primer at the rate of 0.15kg/sqm. Epoxy primer should be dry and surface moisture should be less than 4% before PU application .(d) Laying Fibre glass cloth. (e) Applying Poly Urethane water Proofing coating (minimum three coats with a consumption of 2.20kg/sqm) over the epoxy primer applied surface so as to cover the fibre glass cloth completely as per the direction of Engineer in Charge.
GENERAL Police station Koipuram Maintenance works to Koipuram Police Station General civil work
13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Annual Plan Completion works to Dhwani road Ward 27-2 General Civil Work
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil.