LAC ADS PHC KUMMIL Construction of Administrative block for PHC Kummil vertical extension General Civil Work
... laying in position machine batched and machine mixed design mix M-30 grade cement concrete work, using cement content as per approved design mix, including pumping of concrete to site... without impairing strength and durability as per direction of Engineer - in-charge. All work above plinth level up to floor v level .Note: excess or less cement used as per design ...
Construction of Uma - Nagar Colony Road in Pirayiri GP (Ward - 14), Palakkad District-General Civil Work
... Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with ...
Annual Plan-Construction of Injapathal Panamkutty Road-pro no 202/26 ward 15- General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
AMRUT-Construction of Retaining wall for 800 mm DI pipeline side protection -Amrut- General Civil Work
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
Annual Plan-S1023/26-VATTAKANDAM SC NAGAR ROAD CONSTRUCTION ON WARD NO 46-General Civil Work
Annual Plan-KODIYATHUR GP PROJECT NO 370/26-Construction of Parapuram Smashanam Road-General Civil Work
3.3:Construction of Embankment with Material Obtained from Roadway Cutting <br> Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5