Loading…
Loading…
94,223 results • Best match
Annual Plan-MATHUR GP 2025-2026 NADUTHARA ROAD KOOTUPARAMBU CULVERT CONSTRUCTION-P 220-General Civil Work
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
Annual Plan-DPK -670/26 -Thrikkodithanam Division Paipad GP Nakral Bridge Construction --General Civil Work(Retender)
... bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal ...
Mattannur Municipality 2025-26 Pro.No.322/26-Nalankeri Maruthayi Palam Vayal Road construction-General Civil Work
3.15.2:Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
Annual Plan-Karukutty GP ProNo 279-26-Warium Road Kana Construction Ward-13- General Civil Work
Mattannur Municipality 2025-26 Pro.No.373/26 -Mancheripoyil Kariyil kunnumbram Koolikkadav road Construction- General Civil Work
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
Annual Plan-Karukutty GP ProNo239-26-Besleham Mudapuzha link canal bund road construction-General Civil Work
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.