Loading…
Loading…
94,829 results • Best match
Annual Plan Pro.No 156 Construction of FHC Block Public Health Unit Perumpadappu B P General Civil Work
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
MLA-SDF-2025-26 Nediyakalaparambu Factory padi road Construction-in Ward 03, Thrickodithanam GP-General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Annual Plan-CHOKLI GP Pro No 260/2025-26 ILANTHODATH MEETHAL PARAMB ROAD CONSTRUCTION - General Civil Work
ROAD CONSTRUCTION WORK
Annual Plan-Etpt block - project 195/2025-Construction of Edamaruku CHC Lab Second phase-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
MLA-SDF-PBP-2025-26 CONSTRUCTION OF THERU THODATHAM KANDI - ROAD , CHEMANCHERY GP road -General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
MLA-SDF-2024-25/ CHALAKUDY MUNICIPALITY-W-36, Construction of punchapadam bylane new road -General Civil Work
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.