Loading…
Loading…
95,188 results • Best match
Annual Plan 2025-26 Pro No 270/26 Kizhakkemala Kannancheri Road Construction In Vallikkunnu GP General Civil Work
Road Construction
GENERAL FDR 2025 26 Construction Of New Drain at Karunagappally Alumkadavu Road Ch 2 740 General Civil Work
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
69/24-25-Construction of Kattezhathu Chennamana Link Road in Ward 11 Ezhupunna G P-General Civil Work
road work
Annual Plan-MANJERI MUNICIPALITY 2025-26 PROJECT NO 606-EERPPANACHI ROAD CONSTRUCTION AT WARD 45-General Civil Work
... Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with ...
Annual Plan-PROJECT NO 594/24-25 CONSTRUCTION OF ASRAYA ROAD -WARD 18-PANOOR MUNICIPALITY-General Civil Work
3.4:Construction of Embankment with Material Obtained from Borrow Pits <br> Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
MLA-SDF-2025-26 - Construction of kitchen block for St. Marys HS, Kandanadu-Kitchen block-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil