Loading…
Loading…
94,725 results • Best match
Annual Plan-Velom GP-Construction ofVaryathkandi Edavanachalil road in ward 12-Proj no.245/2025-2026-General Civil Work
3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
GENERAL-Construction Of Community Hall at Sarvodayapuram Mararikulam South Panchayath Alappuzha-Budget 2025-2026 Soil Investigation-General Civil Work
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
MLA-SDF-Mannarkad LAC-2025-26-Construction of Various 2 Roads in Alanallur GP, Palakkad District-General Civil Work
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Annual Plan-Neyyattinkara Municipality 2025- 26 Pro No 459/26-Cremetorium construction completion and additional facilities-General Civil Work
Road work
( Retender) MLA-SDF-Vamanapuram LAC 2025-26 Construction of Culvert in Arayakkunnu - Mazjid Road-Peringammala GP-General Civil Work
OD101094/2025-2026:Construction of Embankment with Material Obtained from Borrow Pits - Manual compaction Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement by manual means.
MLA-SDF-2023-24 Chadayamangalam LAC Construction of Kadambur Anchumukk Kallivila Ela Road-in Velinalloor GP-General Civil Work
3.3:Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5