Loading…
Loading…
94,582 results • Best match
Annual Plan-Karuvarakundu GP 2025-26 100/26 Completion works to Chamakkunnu DWSS-100/26-General Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
GENERAL-AM 2025-26 Anakkal LIS-Annual Maintenance Works to Anakkal LIS, Kulukkallur Grama Panchayath.-General Civil Work
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
GENERAL-RHS Quarters, Melarannoor, Tvpm-Running Maintenance contract works for six months from November 2025-General Civil Work
... after. The scaffolding system shall be stiffened with supports and connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational ...
Annual Plan-Kottiyoor G P 133/25-26 -completion works to Alphonza drinking water scheme-General Civil Work
50.18.9.15.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 40 mm dia 10Kgf/cm2- External work- Exposed on wall
Annual Plan Project 146 26 27 Urgent works Premonsoon cleaning in various wards,Parappukkara GP General Civil Work
earth work
18973-2026 Retender GENERAL-URGENT SCHOOL MAINNTENANACE WORKS 2026-27 GOVT.LPS KIDARAKUZHI in vizjinjam zonal-General Civil Work
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.