Loading…
Loading…
95,317 results • Best match
Annual Plan-PROJECT NO 192/2024-25 CONSTRUCTION OF CHERANKANDI PULIYULLATHIL JAVAN ROAD -WARD 34-PANOOR MUNICIPALITY-General Civil Work
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
Annual Plan-PALLIKKARE GP 2025-26, PR.NO.113/26- CONSTRUCTION OF CHILDRENS FRIENDLY TOILET-IN PALLIKKARE GP- General Civil Work
CONSTRUCTION OF DISABILITY FRIENDLY TOILET
GENERAL-construction of damaged drain ch 2 400 to 2 750 francis road vengali gate road General Civil Work 1
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
MP-LADS--2025-26 - Mulanthuruthy BP - Construction of Nila Residency Road in Maneed Grama Panchayath-Ward-13-General Civil Work
... with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with ...
LAC-ADS-LAC-ADS-2025 Nedumangad- -Construction of shed 10TPB Bio drying processing plant at Nedumangad Municipality.-General Civil Work
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Construction of additional rooms in GSSS NIHRI SUNAH 4 Rooms Block Seraj-1 Distt. Mandi HP Sub Head- Civil work
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.