Loading…
Loading…
95,636 results • Best match
EYE2/2595582/24-Drain construction and tile laying in Mannam Bye lanes in Div 36-Edappally zonal office-General Civil Work
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with ...
Annual Plan-Manjeri Municipality 2025-26, Project No-1299-Construction of Old DMO Office road in ward no7-General Civil Work
Road Work
Annual Plan-PALLIKKARE GP/2025-26-Pro No- 112/25-26- Construction of childrens park - At pallikkare GP-General Civil Work
12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
LAC-ADS-MLA ADS 2024-25 Construction of Swapna theatre to ATM Beach Road-in Ambalappuzha South GP-General Civil Work
OD299319/2025-2026:Construction of embankment with material obtained from borrow pits:- Construction of embankment with approved materials obtained from borrow pits with all lifts and leads, transporting to the site, spreading, grading to required slope, and compacting to meet requirement of table 300-2
Annual Plan-BELLUR GP PROJ NO 90/26 Construction of Side wall protection wall at Nakoor Nidiadka Thod-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
LAC ADS 2025 26 Construction of Talachira Pallimukku pullanjiyodu road and mottakkal kuriyani charumkuzhi road in Vettikkavala Gramapanchayath General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)