Loading…
Loading…
2,488 results • Best match
Renovation work at RTDC Hotel Chambal Kota
Repair to damaged RCC slabs, beams and columns etc for strengthening with cement mortar 1 : 2 in following steps : (1) Choping losse and cracked concrete to required depth, cleaning the exposed surface of steel and concrete with wire brush and sand papering , cleaning of concrete surface with water as necessary and getting dried. (2 )Applying Epoxy primer on the exposed steel bars.(3)Applying Epoxy hardener and resin mix (as per manufectured's specification) on concrete and steel bars with brush. (4) Speading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day.(5) Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete (6)Cure the plastered surface for 15 days, All work including scaffolding etc. complete in all respect.
Renovation Work of Waghodiya Nagarpalika At Waghodiya.
1 Renovation Work of Waghodiya Nagarpalika At Waghodiya.
RENOVATION OF CANTEEN AT KELTRON CONTROLS AROOR
Renovation of Canteen at Keltron Controls, Aroor
RENOVATION OF POND KAMARPUR BAIJUA 1039-2
RENOVATION OF POND KAMARPUR BAIJUA 809-1
Renovation of 11 No. Rooms (Room No. 101 to 107 and 201 to 204) with E.I. Works, Furnishing alongwith up-gradation of kitchen at Bulbul Tourist Complex, Jind.
[10.50.1]Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. 1. Polished Granite stone slab jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. [Through Rate]