Loading…
Loading…
2,859 results • Best match
INSTALLATION OF STREET LIGHT POLES FROM CHATRI CHOWK TO TOHANA ROAD CHUNGI IN WARD NO. 6, MC RATIA
[24.2.3.2]LT CABLE 3.2. Laying of underground cable 0.75 metre below ground level covered without sand and bricks including excavation and refilling of trenches.:- 16 Sq mm to 35 sqmm 2 to 4 Core [Through Rate]
Revamping of Submersible pump motor set & Air conditioning system over Howrah Division.
Trenching and laying of cable underground by pucca floor / concrete cutting and commissioning of cable alongwith make good of floor surface as its original condition after laying of cable ( Cable will be supplied by Railway ) Above/
(I) Electrical work in c/w "Provision of crossing station at PANJWARA ROAD HALT Halt station in between BARAHAT-MANDARHILL Section." (II) Electrical work in c/w "Provision of crossing station at GANGWARA Halt station in between HANSDIHA- PYHT Section." (III) Electrical work in c/w "Provision of crossing station at KURMAHAT Halt station in between HANSDIHA-NONIHAT Section." (IV) Electrical work in c/w "Provision of crossing station at GONUDHAM Halt station in between BHAGALPUR-TIKANI Section."
Latest for underground cable laying of min 0.75
Provision of passenger lifts connecting to FOB at various Railway Stations over Howrah Division".
Trenching and laying of cable underground by pucca floor / concrete cutting and commissioning of cable alongwith make good of floor surface as its original condition after laying of cable ( Cable will be supplied by Railway ) Above/
NIT for Erection work of Main Bus II along with Bus Tie and 220 KV PT at 220 KV Substaion Rewa under Testing Division, Rewa
Cable Laying and assiociates works 2 CORE :- Laying of copper cables 2.5 sq.mm (armoured/un-armoured) on rackes/cable trays/angle support overhead racks conduits including dressing of cables with accessories glands,dressing of cable leads,fixing of tag.
Electrical pole shifting from Badaun Bijnor Marg to Bilsi Nagar 0.00-7.00 due to widening and Strenthening of Roads
Trenchless cable laying for crossing 11kv into hdpe pipe with double ckt