Loading…
Loading…
2,776 results • Best match
Construction of 33/11 KV GSS along with associated 33 and 11 KV lines under TN-466 Lot-4 of Ajmer Discom on Labour Rate Basis
Laying, testing termination of control cable 1100 volts PVC insulated including supply and installation of ferrules to designate various cores of control cables by terminal Nos. of identification including utilization of cable gland. The control cable should be clearly arranged in trenches avoiding crossings including clamping of control cable at regular interval and providing identify tags.
Construction of 33/11 KV GSS along with associated 33 and 11 KV lines under TN-466 Lot-3 of Ajmer Discom on Labour Rate Basis
Laying, testing termination of control cable 1100 volts PVC insulated including supply and installation of ferrules to designate various cores of control cables by terminal Nos. of identification including utilization of cable gland. The control cable should be clearly arranged in trenches avoiding crossings including clamping of control cable at regular interval and providing identify tags.
Construction of 33/11 KV GSS along with associated 33 and 11 KV lines under TN-466 Lot-5 of Ajmer Discom on Labour Rate Basis
Laying, testing termination of control cable 1100 volts PVC insulated including supply and installation of ferrules to designate various cores of control cables by terminal Nos. of identification including utilization of cable gland. The control cable should be clearly arranged in trenches avoiding crossings including clamping of control cable at regular interval and providing identify tags.
Construction of 33/11 KV GSS along with associated 33 and 11 KV lines under TN-466 Lot-7 of Ajmer Discom on Labour Rate Basis
Laying, testing termination of control cable 1100 volts PVC insulated including supply and installation of ferrules to designate various cores of control cables by terminal Nos. of identification including utilization of cable gland. The control cable should be clearly arranged in trenches avoiding crossings including clamping of control cable at regular interval and providing identify tags.
Construction of 33/11 KV GSS along with associated 33 and 11 KV lines under TN-466 Lot-5 of Ajmer Discom on Labour Rate Basis
Laying, testing termination of control cable 1100 volts PVC insulated including supply and installation of ferrules to designate various cores of control cables by terminal Nos. of identification including utilization of cable gland. The control cable should be clearly arranged in trenches avoiding crossings including clamping of control cable at regular interval and providing identify tags.
RREPAIRS AND MAINT OF DISTRIBUTION NETWORK INCLUDING UG CABLES, LT PANEL, LT AREA WISE AND OTHER ITEMS OF OTM COMMON AREA UNDER GE BRICHGUNJ, SRI VIJAYA PURAM
Excavation in trenches not exceeding 1.50m wide and n.exc 1.5m depth for foundation, laying of UG cables etc or for shafts, wells, cesspits, manholes, pier holes etc not excluding 10 Sqm on plan in hard/dense soil and getting out complete all as specified and as directed.