Loading…
Loading…
2,579 results • Best match
Replacement of Electrical Infra alongwith Other Associated Electrical Works at New Hanuman Mandir to Neera Nursing Home under DEPOSIT SCHEME in work area of Executive Engineer 11KV and LT Mahanagar
Laying of 11 KV cable 3 x120 sqmm in pukka road Double circuit by digging of trench upto 1 Mtr Laying of cable in 160 mm HDPE 160 boxing with bricks and sand refilling of earth and proper ramming
CONSTRUCTION OF GOVT. HIGHER SECONDARY SCHOOL BAKA DISTT CHHINDWARA
56 41.20 Laying of underground cable Laying of underground cable armoured./unarmoured as per specification in air suspended on existing approved type of iron clamp, G.I wire 7/1.6mm & shackle insulator/insulated strip complete.
Supply, Installation, Testing and Commissioning of AC Interference mitigation measures in GSPL, Bongaigaon
Cable Laying Laying of all type of cables LT (PVC / XLPE / Armoured/Unarmoured/Power/ Control/ Signalling) in trenches, in cable racks, in trays, in protective pipes, poles,columns, in conduits, in panels and on structures etc.;including the supply and installation of all required materials such as fixing clamps ,screws, cable straps, tags etc. as required (other than the supply of the conduits, cables, pipes, cable racks, trays, poles, structures and panels) complete in all respect, including cost of all labour, tools, consumable materials etc. and cutting the cables in required lengths as per drawings, specification and directions of Site Engineer / Engineer-in-Charge
EWSCA-12/2026-27
Cable Laying (11 KV 3X185sqmm): Laying 11 KV, 3x185mm2 XLPE, Power cable from outgoing switch gear to 11 KV double poles in the cable trench 0.50m wide, 0.90m depth. Providing 150 thickness mm local sand for cushion beneath and 150mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying bricks vertically and bricks would also be laid horizontally on top of vertically laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cables etc. Spare cable shall be left over and laid in the trenches in shape of 6m rings at both ends. At the end of feeder cables, where the cable is to be laid across pucca/main road, 100 mm dia G.I. pipe will be weared over the cable in the cable trench for the protection of cable.
Hyderabad Division: 1) Proposed Construction of new GYM with the PEB structure of size 32x25mm at RSC/SC- Electrical arrangements 2) Construction of indoor volleyball court at RSC/SC- Electrical arrangements 3) Repairs to ground floor, renovation of toilets in first floor room, demolition of kitchen area and construction of new hostel building in Annapurna hostel at RSC ground- Electrical arrangements
Cutting of asphalted road/ concrete/ cement/ under the track etc., and excavation of cable trench 30 cm widex90cm deep road etc., for laying of LTUG cable. After laying of cable the trench should be brought to its original position by providing tar/ concrete/ cement as per the site conditions and as per directions of Rly. Engineer.
Feeder Bifurcation at 04 No. 33/11 KV various Sub-Station Kesco., Kanpur
Mounting and connection of all type of cable box on pole/cable post with the help of MS Clamp as well as cable laying through M.S. /G.I. Pipe the work includes proper clamping of cable box on both end of pipe. 6 inch dia ( 3 mtr. length).