Loading…
Loading…
10,767 results • Best match
IMPROVEMENT OF UTTARAN LIGHTING SYSTEM AT 16,RUPNARAYAN UTTARAN, 56 SN PANDIT AND OTHER UTTARAN AREAS IN WARD NO-71.
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
IMPROVEMENT OF LIGHTING SYSTEM AT MADAN PAL ROW LANE IN WARD NO-73.
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
INSTALLATION OF UTTARAN LIGHTING SYSTEM AT WATTGAUNGE(BAKULBAGAN) UTTARAN AND OTHER UTTARAN AREAS IN WARD NO-76
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
Load diversion from Mominpark 11KV feeder originating from Krishnanagar Power House 33/11KV S/Stn to Nagendranagar 11KV feeder of Krishnagar 33/11KV S/Stn and from Mallickpara 11KV feeder originating from Krishnanagar Power House 33/11KV Stn to Gouri
Excavation of soil by cutting of Metalled Road for formation of Cable Trench including reinstatement of the same after laying of Cable.
LT and HT line Shifting work in the area of EDD Deoband
Digging of Trench 1.5 mter deep for laying cable as per RESPO Specification
Supply and installation of CCTV Camera system at different locations of AC block within, Booth no-129, Ward No- 41, under BMC (Fund - APAS Fund) (Ref Id- APAS/01/116/129/0001) Booth No- 129/116 Bidhannagar A/C, Scheme 1
Providing of CCTV and networking arrangement with full HD 2 Mega Pixel IR night vision IP Bullet camera 9 nos with 30 days data backup including following materials; Hikvision NVR, TJB box, PIGTEL, Media Convertor, Power adaptor, HDD, POE-5 & 8 port switch, Rack, Mouse, SFTP cat 6 cable, RJ 45, Back box, Angle, Wall mounted monitor(32") overhead OFC armoured cable laying, casing pipe with installation configuration & demonistration, remote monitoring, login tutorial at Purbachal.( Warranty of 1 (one) year onsite including all above-mentioned materials).