Loading…
Loading…
6,661 results • Latest
Construction of Devarmal to Dholnar Road Length 3.00 Km.
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, ,carriage of mixed Material to work site, ading in uniform layers with motor grader on prepared rface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 A Plant mix method (with Mechanically crushed stone only) (b) For Sub-base cum drainage layer or upper sub-base with (i) Grading-V Material
Construction of Community Hall Building at Kalaramam Park in Ward Secretariat-43 under Division-24 in Anantapur Municipal Corporation.
Providing laying, spreading and compacting graded HBG crushed stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanicla mixer (pugmill), carriage of mixed material by tipper to site laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth whell roller of 80 to 100kn/vibratory roller 80-100kn weight to achieve the desired density including lighting barricading and maintenance of devirsion etc as per tabels 400.11 & 400.12 amd technical Specification Clause 406 MORD/MORTH.
CONSTRUCTION OF P.C.C ROAD FROM VILLAGE VARAN TO VILLAGE HILAVAI PANCHAYAT HILAVAI, BLOCK BASANTRAI UNDER GODDA DISTRICT.
By Mix in Place Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401(iii)(grading-Iv material)
Construction and maintenance of Rural roads under PMGSY-IV, Batch-I, 2025-26, Package No. RJ08P4-05 (District Bikaner)
Granular sub-base/base/surface course with local materials (Table 400.13) bymix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per MoRD Specification Clause 408. Using naturally occuring gravel. Add extra for carriage of material (Avg Lead 57 km for Distt. Bikaner)
Restoration of rian damages on Bhager Panol Sunhani road in km 0/00 to 3/300 SH C/o Cement Concrete road to village Kangar in km 0/00 to 0/350, R/wall at RD 0/150 to 0/190, B/wall at RD 0/310 to 0/340 and U-shape drain at RD 0/050 to 0/350 under PD
Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 150 mm (One Hundred fifty millimetre)spread thickness (finished work including materials and labour)as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
(Sub Head -Construction of retaining wall Near Toilet Block between RD. 0/015 to 0/055) under Edu. Deposit SID- SDF-2025/1119)
Providing and laying cement concrete 1:5:10(one cement: five sand:ten graded crushed / broken stone aggregate 40 mm (forty milimeters) nominal size ) plums and curing complete including the cost of form work in Retaining walls Breast walls, in or under water complete including, pumping or bailing out water ,dewatering removal of slush as required at site which may arisen at the time of laying under water complete for all heights/depths including cost of form work as per drawings and MORD technical specifications section 800, 900,1200 & 1600 and as per the direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidentals .The rate is inclusive all taxes levy by the government time to time including GST.