Loading…
Loading…
4,258 results • Latest
Renovation Grid Synchronization and Operation and maintenance of Sapteshwar small Hydro Project (2x150 KW) in District Champawat (by deploying manpower with supply of material and consumables) for a period of three years
CIVIL Works
Work of Special R and M Civil works at NSC office building, Nishtha Parisar Govindpura Bhopal
Work of Special R & M Civil works at NSC office building, Nishtha Parisar, Govindpura, Bhopal.
Repair Maintenance work of refractory lining of Wesman furnace in 06-Shop in BHEL, HPEP Factory, RC Puram, Hyderabad
Charges for - (i) dismantling of old refractory bricks at all heights and elevations from Furnace walls, Bogie (wagon) etc., disposing the debris within a lead of 2 km within the Factory Area as directed by Engineer-In-Charge. The rate includes hire charges of all machinery, equipment, labour, loading, unloading, transportation etc. (ii) cleaning and recovering possible old bricks and stacking the same for reuse. (iii) Charges for installation of new bricks by applying new “40% High Alumina Refractory Bricks” in Furnace and “Hot Face Insulation Bricks & Cold Face Insulation Bricks” using Thermotex Refractory Mortar and/or Refractory Super Castable, as applicable. The rate includes cost for labour, consumables, cutting, preparing surface neat & clean for installation of new bricks, transportation of bricks and binding material from BHEL stores, loading, unloading, handling, placement and construction to form required size and shape as per site condition etc., all complete as directed by the Engineer-In-Charge. Only Bricks and binding material will be issued free of cost by BHEL at BHEL Stores.
Under the Swachh Bharat Mission-Urban 2.0, civil construction work for a 5-tonne capacity TPD wet waste processing unit will be carried out in three plots, namely, plots Nos. 730, 729, and 728, located in village Sujanpur, totaling 0.703 hectares.
ठोस अपशिष्ट प्रबन्धन व्यवस्था हेतु
CIVIL WORK
Earth work in excavation in hard soil or gravelly soil including dressing and levelling the bed complete wth all.
Providing and Laying Underground Sewerage Networks in Zones 13-5 and 14-3 and Constructing In-line Pumping Stations 13-5-1,14-3 1,14-3-2 and 14-3-3 at Thengaithittu and Ariyankuppam in Puducherry
Installation of HDPE product pipe by HDD method for on grade gravity sewer including preparing and setting up the plant and equipment, preparing new pipe-work material, making of entry & exit pits upto 3 meter depth, installing new pipe-work and commissioning system or making the system ready for commissioning by HDD operating including, all related civil and mechanical works like excavation, shoring;i strutting, etc. drilling, stringing, reaming, and pulling back the new pipe-work on the designed bore path alignment, proper disposal of drilling fluid and back fill of site after completion all inclusive as per IndSTT:101-2018: Code of Practice for Horizontal Directional Drilling Technique Suiting Indian Conditions.