Loading…
Loading…
375 results • Latest
Construction work of Children Home for Boys under Mission Vatsalya at Charaideo district.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 18.8.1 15 mm nominal dia Pipes
E-Tender for Labour Work for 1 Phase & 3 Phase New Connection And Rectification work under Mahuva Rural 1 Sub Division
any civil and/or criminal case pending at any stage than offer of such bidder /firm will be out rightly rejected.
Supply of Street Light material Aundipatti Town Panchayat
1x 40 வாட்ஸ் பல்பு மட்டும்
Supply of Water supply material Aundipatti Town Panchayat
PVC Pipe கிளாஸ் - 4 1/2" - 10 (Gauge) 1 மீ
Providing and Laying Underground Sewerage Networks in Zones 12-1 and 12-2 and Constructing In-line Pumping Station 12-2-1 at Odiampet in Puducherry
Ground Water Quality Monitoring - One sample at the construction camp location, once during the design verification period of 4 months and quarterly during the construction period of 32 months (11 quarters) as per the Environmental Quality Monitoring Plan.
05/PWD/ADB/PDY/2025-26. Condition Assessment and Rehabilitation of the old Sewerage system at Muthialpet in Puducherry
Providing a complete sewer bypassing system including, but not limited to, developing sewer bypassing plan, developing a spill prevention and emergency response plan, submiting and obtaining approval from the Engineer-in-Charge for the sewer bypassing plan and the spil prevention and emergency response plan, implementing the bypassing and spill prevention and emergency response plan, providing bypassing in accordance with the approved plans throughout the duration of the Work including furnishing labor, materials, equipment, and incidentals required to maintain continuous and reliable wastewater service in all wastewater lines during construction, constructing and maintaining temporary bypass sewers to maintain continuous and reliable wastewater flow in all pipes, including individual service connections, removing and disposing off all offensive matter spilled during the bypass pumping as per the instructions of Engineer-in-Charge.