Loading…
Loading…
8,820 results • Best match
Interception and Diversion works of all existing drains, conveyance network and establishment of Centralized/De-centralized Sewage Treatment Plant(s) based on open technology, inclusive of 4 KLD Co-Treatment facility forFecalSludge/ Septage
Executing necessary piping work including valves, gates, drains, and pathways. Setting up mechanisms for the disposal of treated sewage and effluent by gravity/ pumping. Constructing an Administrative building cum Laboratory cum Store room, and a SCADA & Meter room. Erecting a 1.8 m high boundary ...
Manufacturing Supplying Installing Testing and Commissioning of Passenger lift 2 Nos at J1 and J2 Oshiwara Officers Quarters at Goregaon west
... electrical cable & its connection from L.T main panel board installed at ground floor inside building required for lift, guide rails, ropes, counter weight etc. car enclosure. Car and landing... features stated inTechnical Bid under Shedule of Quantities & Rates (Pg-22). (B)Ancillary Civil Works for the Lift as per Special Specifications.
A/R and M/O LWSS Talwara Chharal in Tehsil Sadar District Bilaspur (SH Operation of pumping machinery and distribution system of water supply for sector storage tank to different habitations for one year).
Civil works: 1 No pump house Rising main: Booster stage 50mm dia 120 Rmt,1st stage 80mmdia=1860 Rmt,... 2x30=60 HP. No of storage tank: 1 No main storage tank & sub storage tank 3 Nos Total working 30 hours per day : through , 5 Nos persons. Indicators to be mentioned:Average per ...
A/R and M/O LWSS Thoru Mangrot in Tehsil Sadar District Bilaspur (SH Operation of pumping machinery and distributions of water supply from water storage tank to sector storage tank at various location under JSV Section Bilaspur for one year).
Civil works: 1 No pump house, 13Nos storage tank Rising main: Distribtuon system: Complete Pumping machinery :2 sets of 40 HP. No of storage tank: 3 Nos & sub storage tank 10 Nos Total working hours 50 per day : through , 8 Nos persons. Indicators to be mentioned:Average per ...
Construction of link road to Kaloh Babali from Babali SH Construction of R.C.C Slab culvert 3.00 mtr span at Rd 3/215.Under MMSY
Earth work in excavation for structures as per drawing and technical specifications clause 305. 1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal ...
Construction of a CC road in Ward No. 13 covering the damaged stretch from the Registry Office to Durga Prasad shop.
वार्ड नं0-03 में गली नं0-10 पप्पू यादव के मकान से ओमकार सिंह के मकान तक सी0सी0 से सड़क निर्माण कार्य। (1 Civil work)