Loading…
Loading…
8,898 results • Best match
Day to day operation and maintenance of Birpara Sub-Division Office Building, Falakata and Dalmore Rest Shed under Birpara Sub-Division within Alipurduar Division, P.H.E. Dte. .(For 12 months)
Any other Civil works to be execute for maintain the rest shed as per PWD, PHE schedule.(Payment will be made as per detail measurement)
Office of Supertending Engineer Construction Circle UP jal nigam Gandhi nagar Bareilly
Survey, Investigation, Design, Installation, Testing, Cmmissioning, Supply and Construction of Nature Based STP of followoing capacity with Coarse Screen Chamber with Grit Chamber... handling , outfall sewer, treated water pumping if required to dispose into river , required buildings , earth filling , site development, boundry wall , electric connection in STP if required ...
Construction of Vidhyadhar Nagar Information, Business and Entertainment VIBE Centre in Sector-1, Vidhyadhar Nagar, JDA, Jaipur
Construction of Vidhyadhar Nagar Information Business and Entertainment (VIBE) Centre on EPC including the following works complete in all respects including all materials, labour, T&P, machinery etc. required ...
Tender for used water managment at nagar panchayat Rudayan on Turnkey basis
Survey, Investigation, Design, Installation, Testing, Cmmissioning, Supply and Construction of Nature Based STP- 300 KLD with Coarse Screen Chamber With Grit Chamber Before STP... handling , outfall sewer, treated water pumping if required to dispose into river , required buildings , earth filling , site development, boundry wall , electric connection in STP if required ...
Monthly Remuneration of PHED managed Alipurduar District , SAMUKTALA, BIRPARA water testing laboratory personnel
Any other Civil works to be execute for maintain the rest shed as per PWD, PHE schedule.(Payment will be made as per detail measurement) Total- 3 Nos
RECONSTRUCTION OF PANDARATHAN SLUICE IN AGARAM VILLAGE OF THIRUVERUMBUR TALUK IN TRICHY DISTRICT.
... 0.15m 2Nos with required holes. Conveying and leading the top beam arrangements to the work site. Fixing the top beam arrangements at the top of the vent in correct position including... materials, labours, charges for all fabricating and hoisting equipments, cost of petty civil works conveyance charges for labours and materials and warranty for 5 years etc.., complete.