Loading…
Loading…
8,899 results • Best match
Comprehensive operation and maintenance and Special repair of 458 Nos Ward level Piped Water Supply Schemes (Quality), 585 Nos Ward level Piped Water Supply Schemes (Non Quality) & 41 nos PWS Scheme based on item rates; constructed by the Public Health Engineering Department including payment to the pump operators, electricity bill for five years. No. of schemes: WLS(Quality): 458 WLS(Non Quality): 585 PWS(Non Quality): 41
4 Total value of civil engineering construction work performed in last five years. Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty ...
Electrical Installation, Airconditioning system, FDA systems at CT scan department at BIN old building, BIN, IPGMER SSKM Hospital, Annex IElectrical Work_Air Conditioning System
Installation charges of the above CSU after making suitable platform with S&F of 2 nos 'C' channel size not less than 75x50x10mm at top and 50x5 mm MS angle at bottom for rigid support with primer and painting work. Allied civil and allignment work also taken to the consideration , mending good upto final finishing .
Provision of Lighting Arrangement & Other Miscellaneous Electrification Works in Rail Museum, Gorakhpur.
... and excellent heat dissipation for long life. Complete in all respect along with its civil foundation work including Foundation Nut Bolt etc.
Development of Track machine sidings with facilities at Vasind, Khardi and Atgaon.
Item- 2 Part "C" Civil work (DSR Item)
SPL REPAIR FOR REPLACEMENT OF PACKAGE TYPE AC PLANT AGAINST BER OF CAPACITY 60 TR AT RADIATION AND ONCOLOGY BLDG OF CH (EC) KOLKATA UNDER GE (A) KOLKATA
... parameters. (v) The chiller shall have minimum five years warranty after completeion of work. (vi) Self‑priming single stage centrifugal monoblock pump (chilled water circulation... reinforced glass scrim along with adhesives and accessories complete. (vii) Necessary civil work viz foundation for placement of chiller and pump as per OEM recommendation shall be deemed included in the scope of work.
Running Operation and Comprehensive maintenance of 2.0 MLD capacity Sewage treatment Plant at Sector-34, Rohini.
Comphrensive maintenance of allied items electro-mechanical parts including Repair and replacement of electro-mechanical component including rewinding of complete pump... with regular Cleaning of bar-screen, cleaning of tanks ,Oil Grease Trap chamber & allied civil works and Disinfecting of chlorine contact tank and cleaning of all water tanks with proper ...