Loading…
Loading…
8,068 results • Best match
CIVIL WORKS
Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor.
CIVIL WORKS
Earth work in Hard soil for foundatiion within 50 mts. Initial lead and lift of 1.5 mt including rough dressing and breaking clots to maximum 5 to 7 cm and laying in layers not exceeding 0.3 mt in depth as Per the direction of Engineer – in – Charge.
CIVIL WORKS
Earth work in Hard soil for foundatiion within 50 mts. Initial lead and lift of 1.5 mt including rough dressing and breaking clots to maximum 5 to 7 cm and laying in layers not exceeding 0.3 mt in depth as Per the direction of Engineer – in – Charge.
CIVIL WORKS
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works