Loading…
Loading…
8,210 results • Best match
Construction of Toilet Block (CT) at Shibpur Kalitala Baroary,Tribeni in Ward No-20 under Bansberia Municipality. (Model No-F Civil Work ) Toilet seats-2 nos and Urinal- 3 nos.
Construction of Toilet Block (CT) at Shibpur Kalitala Baroary,Tribeni in Ward No-20 under Bansberia Municipality. (Model No-F Civil Work ) Toilet seats-2 nos and Urinal- 3 nos.
Facility Management Services - LumpSum Based - Construction of Boundary Wall at 33 11 KV Sub Station Industrial Area; civil work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Construction of Boundary Wall at 33 11 KV Sub Station Industrial Area; civil work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Construction of Boundary Wall at 33 11 kV Substation Visheshwarganj District Gonda; Civil Work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Construction of Boundary Wall at 33 11 kV Substation Visheshwarganj District Gonda; Civil Work; Consumables to be provided by service provider (inclusive in contract cost)
39889-2026 General -Ksmart file no 3942999 Construction of drainage and slab and concreting in Sreekrishna nagar chithravila road in Cheruvakkal ward-1-General Civil Work
Drainage Construction- Elite Gardens
Mumbai Central (MMCT):-(1) Modernization, Upgradation, Renovation of TTE Running Room at station building. (ii)Repair & Renovation of TPC office at Annex building. (DRM office complex)
Supply and installation of GI Cable raceway of size 100 (width) x 50mm (height), 1.6mm/ 16 SWG thickness, non-perforated, complete with accessories such as clamps, fasteners, nut 52 bolts, bends and covers to ensure secure mounting and protection of wires/ cables. Necessary masonry, carpentry and civil works such as cutting opening in the floor, walls, internal partitions, RCC slabs, making of holes etc. as per site requirement for execution of the proposed work for fixing of the race way, making them good by re-plastering/ finishing, painting of walls/ceiling, cleaning of site etc. shall be done by the Contractor, with supply of all required materials.
MISCELLANEOUS CIVIL REPAIRING WORKS AT AUTO WORKSHOP, BIOM BACHELI COMPLEX