Loading…
Loading…
8,563 results • Best match
Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as Open Wells, HGLR, Sump, Staff quarters, Pump house, all Bulk Transmission and Distribution pipelines, valves, pumping machinery & electrical equipment etc. for the Pipaldahad Reg.water supply scheme, including supply of 0.42 MLD portable water to all the, 10 villages, 06 months period. Taluka: Subir,District : Dang based on Open well excluding supply of, Bleaching Powder and PAC Solution, Water and Energy Charges. at various villages of Subir Taluka of Dang District.
from contract receipt of works (in all classes of civil engineering construction works or O&M
Matter of appointing Agency for civil works below Rs.5.00 Lakh
Miscellaneous civil works at pkt-1C sector A1 to A4, Narela.
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and reparing the surface smooth including necessary repairs to scratches etc. complete.
Zonal contract for minor constructions, repair works and supply of building materials for service, Welfare buildings and drains inside North colony, between Konnur high road & New Avadi Road and between Ambedkar road & eastern side compound wall of East colony including foot stall area and between Ambedkar road (including) & western side compound wall of west colony and between Konnur high road & New Avadi road for the year 2026-27 - (East, West & North colony)
GENERAL-Monsoon Preparedness 2026- Puthukudi thodu-Temporary side protection works to house no. 464 in ward no. 5 on d/s side of Puthukudi culvert at Puthukudi in Keezhallur panchayath in Mattannur constituency, Kannur district-General Civil Work-1
Side protection work
Annual Plan-Pala Municipality/ 2026-27-Proj.No. 025/27 MINI INDUSTRIAL ESTATE ROAD -RAJEEV GANDHI ROAD RENOVATION IN WARD 23-General Civil Work
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.