Loading…
Loading…
8,559 results • Best match
Civil, Sanitary and Water supply and Electrical Work
Civil, Sanitary and Water supply and Electrical Work
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (a) All kinds of soil.
Civil, Sanitary and Water supply and Electrical Work
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (a) All kinds of soil.
MPLADS 25 26 KIP LB Kottiyam Branch Canal Construction of retaining wall and Handrail on right side in between Ch 11614 m and Ch 11640 m of Kottiyam Branch Canal Along the side of Maithanam KIP road in Kundara Constituency General Civil Work
Construction of retaining wall and canal lining
Civil works for augmentation of Ash Water Reclamation System at NALCO, Damanjodi
5.22.4 Supplying and placing in position hot rolled deformed bar reinforcement confirming to IS:432 grade one for RCC work at all heights and depths carrying the steel from store/issue point to site of work, straightening, cleaning, decoiling, cutting, bending to required shapes and lengths as per details, including supply and binding with contractor's own black soft ennealed binding wire and placing with proper cover blocks, supports, chairs, spacers, return of unused/scrap/unserviceable steel to Owner's storage point etc. all complete.( REINFORCEMENT STEEL/HOT ROLLED DEFORM BARS SHALL BE ISSUED FREE OF COST AT NALCO'S STORE ).
Retrofitting and Miscellaneous Civil works in around pump houses at IGCAR, Kalpakkam.
Providing and fixing double Tubular scaffolding system using H-Frames / APS system or (cup lock type) on the exterior side made with 40mm dia M.S. tube 1.5m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in-Charge. Note : 1. The elevation area of the scaffolding shall be measured for payment purposes. 2. The payment shall be made once irrespective of duration of scaffolding. 3. The scaffolding system drawing shall be got approved by Engineer-in-Charge. 4. The contractor has to observe all safety procedure while working on heights as per I.S. 3696 (Part-I) (Safety Code for scaffolds). 5. Screen of suitable material shall be provided to the full height of scaffolding and securely tied to protect falling objects coming out during the work is in progress. 6. Necessary aluminium / M.S. ladder shall be provided at the cost of the contractor, to the full height of scaffolding at required location around the building to enable Departmental Supervisor/Engineer climb up and closely watch the repair work of the building.