Loading…
Loading…
8,367 results • Best match
Augmentation Up-gradation of Electro-Mechanical Equipments along with allied Civil Works 62 KLD FSTP at Uranhall Anantnag
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required (In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works).
Const. of Addl T/F Plinth and its allied civil works at 66 KV S/S Gill Kalan. (under op. circle, Bathinda) (Non-RDSS)
Const. of Addl T/F Plinth & its allied civil works at 66 KV S/S Gill Kalan (under op. circle, Bathinda) (Non-RDSS) AGAINST TENDER ENQUIRY NO. 13 /CWD/MKS/ 2026-27
GENERAL Budget 2018 19 20 percentage Substitution work Improvements to Erattayal Polytechnic College to Kallingal road-General Civil Work
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
GENERAL-Budget 2025-26 (Substitution Work) Improvements to Ozhukupara - Thettikkuzhi Road-By providing 40mm Chipping Carpet-General Civil Work
Road Safety Work.
GENERAL-Budget 2025-26 (Substitution Work) Improvements to Pulladi Kallupalam Road -By providing 40mm Chipping Carpet- General Civil Work
4.1.B.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub-base cum drainage layer - Mix in Place Method
Annual Plan-2025-2026 PRO.NO 317/26 BALANCE WORK OF KATTIKKULAM IN WARD 20-KOTTUVALLY GP-General Civil Work
OD411045/2025-2026:RING BUND Type II Putting up ring bund with earth fill gunny bags of top width .75m bottom width 1.5m height 1.5m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work. etc. complete