Loading…
Loading…
8,688 results • Best match
Construction of KGBV Hostel Building at Chunapali PUPS, Raikia Block
Supplying, fitting fixing or constructing of 1.20 mtr dia x 2.55 mtr.Deepsoak-way pit with dry brick walling up to2.10mtr. Height and brick work with cment mortar(1:6) for 0.45mtr height of wall at top, cement plaste(1:3)inside and ouside, inside filled with dry brick khoa of 50mm to 100 mm size to a height of 2.00 mtr form bottom. covered by means of 40mm thick R.C.C perforated slat 50 mm thick RCC. Well cover in pieces fitted with iron rings including earth work in excavation and refiling of cavity around the pit etc all complete as per approved design and drawing ( Per each)
Construction of KGBV Hostel Building at Nuasahi UPS,Balliguda Block
Supplying, fitting fixing or constructing of 1.20 mtr dia x 2.55 mtr.Deepsoak-way pit with dry brick walling up to2.10mtr. Height and brick work with cment mortar(1:6) for 0.45mtr height of wall at top, cement plaste(1:3)inside and ouside, inside filled with dry brick khoa of 50mm to 100 mm size to a height of 2.00 mtr form bottom. covered by means of 40mm thick R.C.C perforated slat 50 mm thick RCC. Well cover in pieces fitted with iron rings including earth work in excavation and refiling of cavity around the pit etc all complete as per approved design and drawing ( Per each)
CONSTRUCTION OF HIGHER SECONDARY SCHOOL BUILDING AT ASHAPUR, DISTT. KHANDWA
CONSTRUCTION OF HIGHER SECONDARY SCHOOL BUILDING AT ASHAPUR, DISTT. KHANDWA
CONSTRUCTION OF HIGHER SECONDARY SCHOOL BUILDING AT BANDARKACHHA, DISTT. BADWANI
CONSTRUCTION OF HIGHER SECONDARY SCHOOL BUILDING AT BANDARKACHHA, DISTT. BADWANI
CONSTRUCTION OF HIGHER SECONDARY SCHOOL BUILDING AT MALWAN, DISTT. BADWANI
CONSTRUCTION OF HIGHER SECONDARY SCHOOL BUILDING AT MALWAN, DISTT. BADWANI
CONSTRUCTION OF ADMINISTRATIVE BUILDING AT JALALPUR POLICE STATION, DISTRICT JAUNPUR
Providing and injecting chemical emulsion for constructional antitermite treatment and creating a chemical barrier under and alround the column pits. Wall trenches basement Excavation Top surface of plinth filling Junction wall and floor along the external perimeter of binding expansion joints, surrounding of pipes and conduit etc complete (plinth area of building at ground floor only, shall be measured as per 6313 (Part II 1981) Excluding GST. Aldrine emulsifiable concen-trate any other approved material such as Heptrachlor or Chlordance will be used. The rate of application of chemical emulsion shall be as follows: (1) Treatment for Masonry 8 foundation 5 liters per sqm. (2), Back fill in immediate contact with foundation 7.50 liters per sqm. (3) Treatment of top surface of Plinth fillings 5 liters / sqm. (4).Treatment of Soil along External perimeter of Building 7.50 liters/ sqm. (5). Treatment of soil under Apron along with external perimeter 5 liters / sqm