Loading…
Loading…
8,205 results • Best match
Custom Bid for Services - Repairing of Rolling Shutter at ITER-India Lab Building, IPR Similar Category Repair and Overhauling Service Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Repairing of Rolling Shutter at ITER-India Lab Building
Civil Engineering works in connection with the provision of 1 No. Passenger Escalator and 1 No. Passenger Lift on Platform No. 1 at MV Station.
of the building for occupation. Base frame work
A.R.C. year 2026-27 for civil works for various health care facilities in Ta-Una,Ta-Kodinar & Ta-Girgadhada Dist.Girsomnathtal Campus, Asarwa Ahmedabad.
1455 06001AA 6 Brick work using common burnt clay building bricks having crushing strength not
Annual Plan-Punalur Municipality 2026-27 Pro No- 51/27-MUSSAVARI WARD-BETHEL RAILWAY SATATION ROAD ROAD RE-TARRING-General Civil Work
Road Renovation
GENERAL-Budget 2025-26 (Substitution Work) Improvements to Inchakkad Anathara Portion - Kalayapuram Road (Including Koluvila Nagar Portion ) -By providing 40mm Chipping Carpet-General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Repair works to North East Portion of Main Building for the New Purchase and stores department office at NIT Warangal
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.