Loading…
Loading…
8,112 results • Best match
Building Work/ Building Maintenance Work/ Civil development works with PH items.
31 Guidelines for Air Pollution mitigation (i) The charges for the Air Pollution mitigation measures shall be borne by the contractor without any extra cost to the department. (ii) Contractor shall follow the directions for Dust and Pollution Control measures in construction as notified by MoEF&CC / MoHUA / CPWD / BMC or any other statutory authority. (iii) All precautionary measures for control of Air Pollution due to Building Construction Activity shall be taken as per Local Statutory/ Municipal Authority Air Pollution Mitigation Plan. (iv) Mandatory Form for Building Construction activity to control Air Pollution along with supporting documents and site photographs shall be submitted to concerened authority or uploaded on online portal. (v) Projects attracting Environmental Clearance shall carry out Third Party Ambient Air Monitoring every fortnightly from NABL / MoEF&CC laboratory.
Civil and Electrical works for Construction of Model AYUSH OPD Building in the district of Purba Mednipur, West Bengal during the year of 2025-26 at SHD at Barsundra PHC (2nd Call)
Civil & Plumbing works for Construction of Model AYUSH OPD Building in the district of Purba Mednipur , West Bengal during the year of 2025-26 at SHD at Barsundra PHC. (refer detailed BOQ 1-A)
GENERAL-IE OorakamMaintanance works-Internal roads and allied works-General Civil Work
e-tender for the GENERAL-IE Oorakam Maintanance works-Internal roads and allied works-General Civil Work for more details refer tender documents
Miscellaneous civil repair works for pedestrian safety in Zone B area JDA Jaipur (ARC)
Construction of service block for shifting of services from main building at Rashtrapati Bhavan New Delhi Subwork/Packages: E and M services O and M of E and M services including civil works
Civil maintenance works and construction of store room at Asansol IT Park
MAKING ONE SET OF SCAFFOLDING FOR REPLACING GLASS PANELS, PAINTING, UPROOTING PLANT AND ANOTHER REPAIRING WORKS OF BUILDING AND S&P WORKS FOR EXTERNAL WORKS ONLY WITH 10 CM. DIA BAMBOO AS MAIN POSTS AT THE RATE OF 1 METRE CENTRE TO CENTRE AND 7.5 CM. DIA BAMBOO TIES @ 0.75 METRE APART FITTING AND FIXING WITH NECESSARY COIR, NAILS ETC. AS PER DIRECTION OF THE ENGINEER-INCHARGE. (THIS ITEM SHOULD BE EXECUTED ONLY AFTER PRIOR APPROVAL OF THE ENGINEER-INCHARGE).FIRSTLY, ONE NUMBER TO BE PAID AND THEN LABOUR RATE FOR SHIFTING UP TO FURTHER NINETEENTH (19) TIMES @ 10% EACH TIME TO BE CONSIDERED. IF NECESSARY FURTHER AFTER TWENTY TIMES OF TOTAL USE, ANOTHER ONE NUMBER NEW AND LABOUR RATE FOR SHIFTING TO BE CONSIDERED ACCORDINGLY, A) 3.90 METRE HEIGHTplus Extra for additional 3.6 height or part thereof