Loading…
Loading…
8,210 results • Best match
Construction of 33 kv s/s building and boundary wall at Hindal Gol
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (B-98/ 9.2)
Construction of 33 KV sub-station building and boundary wall at Jethantari (Samdari).
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (B-98/ 9.2)
Construction of 33 KV Sub Station Building and Boundary Wall at Annapurna Mataji.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (B-98/ 9.2)
Construction of 33 KV sub-station building and boundary wall at Rampura (Samdari).
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (B-98/ 9.2)
CONSTRUCTION OF PROSECUTION OFFICE BUILDING AT BIHARSHARIFF IN THE DISTRICT OF NALANDA WITH ELECTRIFICATION
Steel work welded in built up sections/framed work including cutting hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel, etc as required: In gratings, frames, guard bar, ladders, railing, brackets, gets & similar works.
CONSTRUCTION OF PROBATION OFFICE BUILDING AT MOTIHARI IN THE DISTRICT OF MOTIHARI - WITH ELECTRIFICATION
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of centring, shuttering finishing and reinforcement, M-20 grde reinforcd cement concrete :All work upto plinth level:All works above plinth level upto floor V level : Walls columns, pillars, posts cind struts: Add or deduct for providing richer or leaner mixes respectively at all floor levels:Proiding M-25 grade R.C.C. instead of M-20 grade R.C.C.