Loading…
Loading…
8,269 results • Best match
Civil work for transformer augmentation of 220/132 KV 100 MVA T/F-III at 220 KV GSS Dhod, Sikar
Construction of un-reinforced,plain cement concrete pavement, thickness as per design, over aprepared subbase, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 150 micron thick polythene film,wedges,steel plates including levelling the form work as per drawing), spreading the concrete withshovels, rakes, compacted using needle, screedand plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately (R-16.76)
AMRUT-retarring of parappinmotta-davath road(0 000 to 0 543) div 25-Sl. No.38 Elayavoor-General Civil Work
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
GENERAL Budget Providing BM and BC to Onninmoodu Mylavila Kadambattukonam road Ch 3 00 to 7 000 General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
GENERAL-Aiswarya gramam padhathi-SC Development-Improvement of basic facilities of Chudalapara colony in Marangattupilly Grama Panchayat-General Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Providing Tube Well in 5 Nos in PVK (Kota, Bharatpur, Dholpur, Jhunjhunu and Jobner) Under RUVAS (Jobner) Jaipur. (Civil and Electrical work)
CIVIL WORK
SPECIAL REPAIR TO BUILDING NOS. P-68, P-254 AND P-278 AT SEVOKE ROAD MIL STN UNDER GE SEVOKE ROAD
Supply & fixing mild steel framed work such as grills, gratings, etc with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe 290 Gde-E-165 complete all as specified and directed.