Loading…
Loading…
8,025 results • Best match
Construction of 3 no. of Roof Top Rain Water Harvesting Structure at Main Building and Classroom Building of B.K. High school and Community Health Centre Building in Digapahandi Urban area under Ganjam District for the F.Y. 2026-27.
Rigid and smooth centering and shuttering for R.C.C. works including false works and dismentalingthen after casting including cost of materials complete.
LAC-ADS-LAC ADS of KayamkulamLACProviding 40mm MSS to Mavoli Junction to Sastham Koickal Junction road from 0/000 to 0/420 in Chettikulangara Grama Panchayath- Work-General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>
Annual Maintenance Contract for Civil works in Operational area with boundary wall i/c Navaids and Runway/ Apron painting during year 2026-27 at JPNI Airport, Patna
Zone No. II: Civil maintenance including Water supply, Sanitary and Horticulture works at Old Koilaghat & New Koilaghat Building areas, Eastern Railway, Kolkata for the period ending 30.06.2027.
Providing and fixing 6 mm thick BWP (IS:710) ply plain lining with necessary screws/nuts & bolts/ nails and fixed on existing frame work, complete as per direction of Engineer-in- charge (Frame work shall be paid separately).
Construction of New Maternity Home at PHC Bhatiwada Ta.Dahod. District.Dahod
including the cost of form work but excluding cost of Reinforcement for RCC work in Six Hundred Twenty
BOQ
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded.