Loading…
Loading…
8,094 results • Best match
Construction of Toilet at First Floor of Tehsil Building and Other Work at Collectorate Campus, Jodhpur
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete:
Providing consultancy services for the construction of modern kitchen facility for the proposed Employee Cafeteria building
Providing Consultancy services for the Employee Cafeteria facility at CIAL, from initial planning through commissioning until the kitchen is fully operational and capable of delivering the required menu and operational outcomes as detailed in Section 1: Scope of work. The fee quoted shall be inclusive of all cost as well as profit, overheads/Income Tax as applicable, except GST. TDS will be applicable against the payment.
Inviting for the Supply of Building Material for Construction of Pandhan Rasta Kondya Vandanwar te Jamni
Repair work
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, with in a lead of 50 m. as directed by the Engineer-in- charge. (a) All kinds of soil.
Repairing and Renovation of ITI Building at Palanpur (Repairin g and Renovation of Various Building and Campus at ITI) (2nd Attempt)
AMRUT-Retarring of sanjaya road(ch 0 000 to 0 200) ward 6 and 8-Sl.No.1 Puzhathi zonal-General Civil Work
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.