Loading…
Loading…
8,153 results • Best match
Repair of BTS foundation and provision of cage along with platform for 4G BTS equipment at Galla Mandi, repair to RTT foundation structure at Indra Nagar Civil Lines BTS site and Rajghat Tirraha BTS site situated at Sagar. 2nd call
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
DEPOSIT-Construction of PHC at Sugandhagiri GF Phase-1 Construction of New building for PHC at Sugandhagiri wayanad Electrification General Electrical Work
OD29692/2026-2027:Supply &Installation of dust and vermin proof, 3 Phase Syntex meter board {GS MB-6535) / Equivalent make of size 650x350x250 suitable for fixing KSEB meter,fuse units, CT etc, hinged door construction for the front side with compartments if necessary, providing vision panel for the meter compartment, knock out for cable entry and exit.
ANNUAL REPAIR FOR HIGH COURT MAIN BUILDING AND OTHER IMPORTANT BUILDINGS ITS PREMISES AT HIGH COURT BODRI BILASPUR. UNDER HIGH COURT, SUB DIVISION-2, BILASPUR (C.G.)
Construction of New Aanganwadi Building at Various Village Taluka-Chikda Dist-Narmada Package-04 (2nd Attempt)
5. 1.00 % of Construction cost shall be deducted form Bill. Amount of Contract as per the Building and other Construction
Construction of New Aanganwadi Building at Various Village Taluka-Sagbara Dist-Narmada Package-06 (2nd Attempt)
5. 1.00 % of Construction cost shall be deducted form Bill. Amount of Contract as per the Building and other Construction
Operation and Maintenance 10 MGD Surface water treatment plant (both for Civil and E and M component of works)......in District- Howrah, for a period of 30(Thirty ) months.
Operation and Maintenance 10 MGD Surface water treatment plant (both for Civil and E&M component of works) including supply of coagulants (Alum & PAC), Liquid Chlorine, cleaning compound, Sludge disposal and supply of required laboratory reports etc. for 10MGD WTP constructed under State scheme (Phase-II)within the premises of Padmapukur WTP, in District- Howrah, for a period of 30(Thirty ) months.