Loading…
Loading…
8,153 results • Best match
SETTING UP OF PROJECT MANAGEMENT UNIT UNDER HARYANA BUILDING AND OTHER CONSTRUCTION WORKER WELFARE BOARD, LABOUR DEPARTMENT, GOVERNMENT OF HARYANA
SETTING UP OF PROJECT MANAGEMENT UNIT UNDER HARYANA BUILDING AND OTHER CONSTRUCTION WORKER WELFARE HBOCWW BOARD, LABOUR DEPARTMENT, GOVERNMENT OF HARYANA
Facility Management Services - LumpSum Based - Custom Bid for Services - Civil Refectory Masonry Work in chimney; Refectory masonry work in Chimney of Boiler No 1 and 2 in mill site; Cost of consumable to be reimbursed to service provider on actual
Facility Management Services - LumpSum Based - Custom Bid for Services - Civil Refectory Masonry Work in chimney; Refectory masonry work in Chimney of Boiler No 1 and 2 in mill site; Cost of consumable to be reimbursed to service provider on actual
GENERAL CHIRAKKAKOM PADASEKHARAM KP Mitigation of Flood in Padasekharams of Kuttanad Taluk Mitigation of Flood in Chirakkakom Padasekharam Pulincunnu Panchayath General Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
GENERAL_Pre monsoon preparedness 2026_27_PyIP_Emergency cutting and removal of damaged and threatening trees in the project land under Pyip section 2 Mattannur_General Civil Work
MP-LADS-Concreting of Road from Kinattumukku to Myladumkunnu in Ashtamangalam ward in Punalur Municipality in Pualur Constituency (SC)-MPLADS-General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Yearly repair and maintenance works of Directorate of Social Welfare Building in the premises of Shaishali Complex during the year 2026-2027 (S and P works).
Making one set of scaffolding only for replacing glass panels, painting,uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. For14.20 Mtr