Loading…
Loading…
8,153 results • Best match
Construction of 33 KV S/S Building and Boundary wall at Mohangarhunder Anandpur Kalu S/D.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (B-98/ 9.2)
Construction of New Anganwadi Building At Dabhoda – 9 In Gandhinagar Taluka Year 2025-26 , Dist.: Gandhinagar.
Brick work using common burnt clay building
Construction of 33 kv s/s building and boundary wall at Rawalgarh under Balesar S/D
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (B-98/ 9.2)
Construction of sub division office building including compound wall and other development work at Gadra road.
Earth work in filling at site with soil free from vegetation & organic material incl. Excavation cost of material loading unloading carriage compacted with manual / mechanical means & levelling top surface evenly as per direction of Engineer incharge with all lead & lift ( Appd. by SE Civil JU D-1903 Dt 23-02-23)
Construction of Settibalija Community hall building at Kavalavari savaeram in 18th ward - Under Mpl Geneeral Funds
Supply and placing of the M 20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges, centering, shuttering for finished item of work as per SS and as directed by the departmental officer in charge of the work but excluding seigniorage charges.
Building and yard maintenance
2.2.1:Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m:All kinds of soil